Media

Photo Gallery

Programs for 2015-16 Session

Video Gallery

The Institute of Engineers (India) marches on

Safety inspection and evaluation of existing civil structures

Common distresses in dams & safety measures

Safety measures in dams part I

Safety measures in dams part II

Geophysical investigations

Integrated geo-physical approach for dam health check & dam condition monitoring

Integrated geo-physical approach for dam health check & dam condition monitoring Part II

Safety issues for foundation of aqueduct – a case study of restoration: Sardar Sarovar Project

Case study of renovation and structural strengthening of office building

Scars of multi-storeyed buildings

Scars of multi-storeyed buildings Part II

Safety evaluation of structures

Failure of obligatory span of flyover bridge – a case study

Failure of obligatory span of flyover bridge Part II

Use of ground penetrating radar for concrete inspection

Contractual disputes & arbitration

Contractual disputes and arbitration



Rain Water harvesting, Ground water recharging

Rainwater harvesting in urban and rural areas

Productive use of ground water recharge and its use through micro irrigation

Ground water recharge using remote sensing and GIS

Safety Inspection and evaluation of gates of dams & canals

Operation and maintenance of fixed wheel gates

Safety inspection of gates and its documentation


Participatory Irrigation Management (PIM)

Participatory irrigation

PIM Case study : Mohini Water Users’ Association

PIM in Ver & Isar Projects of South Gujarat

Empowering Water Users’ Associations through PIM in Karnataka

PIM for prosperity in agriculture

Community managed lift irrigation schemes in tribal areas

From policy to practice Role of capacity building in PIM

PIM Case study – Erthan WUA, Vadadala


Planning, designing, manufacturing, laying, testing & commissioning of pipeline system and pumps

Planning and designing pipeline system for conveying water

Planning and designing pipeline system for conveying water Part II

Manufacturing of pipes, coating and testing parameters

Manufacturing of pipes, coating and testing parameters Part II

Manufacturing of pipes, coating and testing parameters Part III

Manufacturing of pipes, coating and testing parameters Part IV

Manufacturing of pipes, coating and testing parameters Part V

Manufacturing of pumps and Performance testing

Manufacturing of pumps and Performance testing Part II

Performance case study Part I

Performance case study Part II

Manufacturing different types of coatings on internal & external surfaces of pipes

Dual layer coating of pipes

Quality Control & Quality Assurance

Surge Control System Part I

Surge Control System part II

Importance of selecting energy efficient power / distribution transformer


Monthly Newsletter

Enter Your E-mail for Monthly Newsletter
[wysija_form id=”1″]